Jiangsu, China
Business Type:
Number of Employees:
Year of Establishment:
OEM/ODM Service

C-Z Roll Forming Machine, Purlin Machine, Roll Forming Machine manufacturer / supplier in China, offering C&Z Purlin Interchangeable Roll Forming Machine, Guide Rail Roll Forming Machine (YX41-41), Double Rows Guide Rail Roll Forming Machine and so on.

Gold Member Since 2009
Audited Supplier

C&Z Purlin Interchangeable Roll Forming Machine

Get Latest Price
Min. Order: 1 Piece
Port: Shanghai, China
Production Capacity: 300set/Year
Payment Terms: L/C, T/T, Money Gram
Certification: CE, ISO9001
Customized: Customized
Condition: New
Control Type: Electric
Automatic Grade: Automatic
Type: Rolling Machine

You Might Also Like


Basic Info

Model NO.: C&Z purlin
Power Source: Electric
Feature: High Efficiency
Advantage: Use Widely
Trademark: Saibo
Transport Package: No Packing
Specification: CE SGS
Origin: Jiangsu, China
HS Code: 84552210

Product Description

C&Z Purlin Interchangeable Roll Forming Machine
1. Profile Drawing:
C&Z Purlin Interchangeable Roll Forming Machine
NoSpecification of the material
Suitable MaterialCarbon steel
Width of the raw materialBased on the purlin sizes.

2. The Chart of Process Flow
C&Z Purlin Interchangeable Roll Forming Machine

3. Main Specification
1Machine structureCast iron structure
2Total powerMotor power-15kw
Hydraulic power-5.5kw
3Roller stationsAbout 14 stations
5Drive systemBy chain
6Diameter of shaft¢70mm solid shaft
Voltage380V 50Hz 3phases (Customized)
Container need40GP container

4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation

5. Warranty
Warranty: 1 year warranty from date of shipment
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.

6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

ATTENTION: The profile of the panel is according to the clients!

Send your message to this supplier

avatar Miss Nancy Li

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed