Jiangsu, China
Business Type:
Number of Employees:
Year of Establishment:
OEM/ODM Service

Welding Pipe, Welding Pipe Making Machine Line, High Frequency manufacturer / supplier in China, offering High-Frequency Welding Pipe Making Machine Line (ZY-50), Guide Rail Roll Forming Machine (YX41-41), Double Rows Guide Rail Roll Forming Machine and so on.

Gold Member Since 2009
Audited Supplier
Supplier Homepage Products Welding pipe line High-Frequency Welding Pipe Making Machine Line (ZY-50)

High-Frequency Welding Pipe Making Machine Line (ZY-50)

Get Latest Price
Min. Order: 1 Piece
Port: Zhangjiagang, China
Production Capacity: 20set/Year
Payment Terms: L/C, T/T
Control Type: PLC
Customized: Customized
Condition: New
Automatic Grade: Automatic
Certification: CE, ISO9001
Type: Special Casting

You Might Also Like


Basic Info

Model NO.: ZY-50
Trademark: SAIBO
Transport Package: Sea Packing
Specification: CE SGS
Origin: China
HS Code: 84552210

Product Description

Technology procedures
Uncoiling →shear & end welding→ spiral loop→ leveling→ forming→ HF Welding →scraper →cooling→ sizing→ straightening →flying saw →run out table
High-Frequency Welding Pipe Making Machine Line (ZY-50)
I: Main technical specification

1: Raw material (steel coil) condition

Steel coil material: Hot rolled or cold rolled low carbon steel

2: Finished product requirements

Round pipe

Out diameter: φ 20~φ 63.5mm

Wall thickness: 0.8~3.0mm

3: Machine arrangement

Machine arrangement form: Split style

Arrangement: Feed, side discharge (look from console, decided by customer)

Machine production speed: 0~80m/min

Warranty: 1 year warranty from date of shipment
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Reparis will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 80$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.

Send your message to this supplier

avatar Miss Nancy Li

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now