Anode Plate Roll Forming Machine

Type: Rolling Machine
Forging Forming Method: Mold Forging
Power Source: Electric
Feature: High Efficiency
Certification: SGS, ISO9001, CE
Warranty: 12 Months
Customization:
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2009

Suppliers with verified business licenses

Jiangsu, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (27)

Basic Info.

Model NO.
Anode plate roll forming machine
Customized
Customized
Advantage
Use Widely
Condition
New
Product Name
Anode Plate Roll Forming Machine
Power
About 33kw
Roll Material
Gcr15
Transport Package
No Packing
Trademark
SAIBO
Origin
China
HS Code
84552210
Production Capacity
300sets/Year

Product Description

1. Equipment structure   
This production line consists of forming, punching,cutting,etc.
The production line is composed of de-coiler, forming ,punching, cutting system , electric control system , etc.

2. Technical parameter
 
NO.
 
Item Unit Parameter
1

Thickness
mm 1.2mm
2

Speed
m/min  Forming speed:about 15m/min
3

Material roller
  GCr15 quenching treatment
4

Drive type
  Gearbox driven
5

Motor power
kw about 33
6

Electric control system
  PLC veriable frequency control
7

Dimension(LxWxH)
m 30x4x3.9 

3. Warranty
Warranty: 1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 80$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.

4. Installation and training
a. If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b. Without visiting, we will send you user manual and video to teach you to install and operate.
C. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now