Jiangsu, China
Business Type:
Number of Employees:
Year of Establishment:
OEM/ODM Service

C-Z Roll Forming Machine, Purlin Machine, Roll Forming Machine manufacturer / supplier in China, offering C&Z Purlin Interchangeable Roll Forming Machine, Guide Rail Roll Forming Machine (YX41-41), Double Rows Guide Rail Roll Forming Machine and so on.

Gold Member Since 2009
Audited Supplier

C&Z Purlin Interchangeable Roll Forming Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $40,000/ Piece
Port: Zhangjiagang, China
Production Capacity: 300set/Year
Payment Terms: L/C, T/T, Money Gram
Warranty: 1 Year
Certification: CE, ISO9001
Customized: Customized
Condition: New
Control Type: CNC
Automatic Grade: Automatic

You Might Also Like


Basic Info

Model NO.: YX100-300
Type: Rolling Machine
Power Source: Electric
Feature: High Efficiency
Advantage: Use Widely
Trademark: Saibo
Transport Package: No Packing
Specification: CE SGS
Origin: Jiangsu, China
HS Code: 84552210

Product Description

1.Profile drawing:
C&Z Purlin Interchangeable Roll Forming MachineC&Z Purlin Interchangeable Roll Forming Machine
NoSpecification of the material
Suitable MaterialCarbon steel
Width of the raw materialBased on the purlin sizes.

2.Machine Detailed Parameters:
1Machine structureCast iron structure
2Total powerMotor power-15kw
Hydraulic power-5.5kw
3Roller stationsAbout 16stations +1 stations correction station
5Drive systemBy Chain 1.0inch double line
6Diameter of shaft¢70mm solid shaft
Voltage380V 50Hz 3phases (Customized)
Container need1X40GP container 
3. The Chart of Process Flow (only for reference)
C&Z Purlin Interchangeable Roll Forming Machine
4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation

5. Warranty
Warranty: 1 year warranty from date of shipment
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

Send your message to this supplier

avatar Mr. nancy

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed