• 5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
  • 5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
  • 5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
  • 5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
  • 5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
  • 5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine

5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine

After-sales Service: 1 Year
Warranty: 1 Year
Certification: CE, ISO9001
Customized: Customized
Condition: New
Control Type: CNC
Customization:
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2009

Suppliers with verified business licenses

Jiangsu, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (27)
  • Overview
  • Product Description
  • Packaging & Shipping
  • Warranty
  • Payment term
Overview

Basic Info.

Model NO.
C Purlin
Automatic Grade
Automatic
Type
Rolling Machine
Power Source
Hydraulic Pressure
Feature
High Efficiency
Advantage
Use Widely
Forging Forming Method
Mold Forging
Thickness
4.0-5.0mm
Roll Stations
About 17stations
Roller Material
40cr,Tempering
Main Power
55kw
Shaft Diameter
110mm
Transport Package
No Packing
Specification
CE, SGS
Trademark
SAIBO
Origin
Jiangsu, China
HS Code
84552210
Production Capacity
300sets/Year

Product Description

 
Product Description

1. Profile drawing:


5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
No Specification of the material
1
 
Suitable Material Carbon steel
2
 
Width of the raw material Based on the purlin sizes.
3
Thickness
 
1.5mm-3.0mm

 2. The Chart of Process Flow
Decoiler→ Feeding→flatten →punching→roll forming→correction adjust→ cutting→output table

4. Specification of Components
5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
Punching system
1.Base on customer provide punching drawing, this machine need adopt three units hydraulic punching system before roll forming.
2.The punches and dollies will be CR-12, hardness HRC 58-62 and chrome coating.
3.Hydraulic power: 15kw
5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
Roll forming machine
1.Thickness range: 4.0-5.0mm
2.Main motor power:55kw
3.Machine Voltage, Frequency, Phase: 415 V, 50 Hz, 3Phase
4.Roll station: about 14stations+ one station of rectify
5.Roller material:GCR15 chrome plated surface with hardness 58-62 degree
6.Shaft diameter: ¢110mm material: 40cr with quenching and tempering
7.Drive by gear box
5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
Main machine structure
1.Main frame by whole H beam welding
2.Machine structure: Cast Iron
3.Drive by gear box
5mm Steel Frame Structure Automatic Changed C Purlin Cold Roll Forming Making Machine
Hydraulic cutting
1.Machine adopts hydraulic post cutting system.
2.Cutting power by hydraulic, 15KW
3.Cutting after forming: Cut the sheet after roll forming to required length
4.Cutting motion: The main machine will stop when cutting, after the motion the machine will continue automatically.
5.Material of blade:Cr12 with heat treatment 58-60°
6.Tolerance of length: 3000mm+/- 1.5mm
 
Packaging & Shipping

4. Packing & Delivery

  1. Deliver time: take goods after receive deposit 60 days
  2. Packing: suitable of ocean transportation
Warranty

5. Warranty

  1. Warranty: 1 year warranty from date of shipment
  2. Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
 
Payment term

6. Payment Term

   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment
 



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now