Jiangsu, China
Business Type:
Number of Employees:
Year of Establishment:
OEM/ODM Service

Roll Forming Machine, Rolling Machine, Automatic Stacker manufacturer / supplier in China, offering 12m Auto Stacker for Roofing Machine, Guide Rail Roll Forming Machine (YX41-41), Double Rows Guide Rail Roll Forming Machine and so on.

Gold Member Since 2009
Audited Supplier

12m Auto Stacker for Roofing Machine

Get Latest Price
Min. Order / Reference FOB Price
1 Piece US $4,000-10,000/ Piece
Port: Zhangjiagang, China
Production Capacity: 500sets/Year
Payment Terms: L/C, T/T, Western Union, Money Gram
Type: Hydraulic Machine
Forging Forming Method: Free Forging
Power Source: Electric
Feature: High Efficiency
Certification: ISO9001, CE
Warranty: 12 Months

You Might Also Like


Basic Info

Model NO.: 12M
Customized: Customized
Advantage: Use Widely
Condition: New
Color: Blue and Yellow
Trademark: SAIBO
Transport Package: No Packing
Specification: CE SGS
Origin: Jiangsu, China
HS Code: 84552210

Product Description

Automatic stacker
1. Brief introduction:
A: Simple structure and beautiful outlook;
B: Easy to setting and operation
C: Little noise and high working efficiency.
2. Main technology parameter:
1. Motor power: 0.75KW
2. Max speed: 36m/min
3. Max stacking length: 12m/6m
4. Max stacking thickness: 300mm
5. Max stacking weight: 2 tons
6. Frequency unit imported from Korea LG
7. Computer PLC. Modles7-200, Simens
8. Computer operation screen is TD200 from Simens
Transmitting-- rolls output---- rolls moving---sheet entry---sheet landing----output
Our automatic stacker have two types: One is 12m and the other one is 6m.
We also can design it depend on client request

4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation
5. Warranty
Warranty: 1 year warranty from date of shipment
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

Send your message to this supplier

avatar Miss Nancy Li

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now