Gold Member Since 2009
Audited Supplier
Zhangjiagang City Saibo Science & Technology Co., Ltd.

Three Waves Guard Rail, Guard Rail Forming Machine, Expressway Guard Rail Roll Forming Machi manufacturer / supplier in China, offering Three Waves Guard Rail Roll Forming Machine, Guide Rail Roll Forming Machine (YX41-41), Double Rows Guide Rail Roll Forming Machine and so on.

(/ )

Supplier Homepage Product Guard rail roll forming machine Three Waves Guard Rail Roll Forming Machine

Three Waves Guard Rail Roll Forming Machine

FOB Price: Get Latest Price
Min. Order: 1 Set
Port: Shanghai, China
Production Capacity: 300sets/Year
Payment Terms: L/C, T/T, Western Union
Basic Info
  • Type: Rolling Machine
  • Power Source: Electric
  • Certification: SGS, ISO9001, CE
  • Customized: Customized
  • Condition: New
  • Trademark: SAIBO
  • Specification: CE SGS
  • HS Code: 84552210
  • Forging Forming Method: Roll Forming
  • Feature: High Efficiency
  • Warranty: 12 Months
  • Advantage: Easy to Maintenance
  • Color: Blue and Yellow
  • Transport Package: Sea Packing
  • Origin: China
Product Description
Three Waves Guard Rail Roll Forming Machine
1. Profile Drawing:
Three Waves Guard Rail Roll Forming Machine

Three Waves Guard Rail Roll Forming Machine
2. The Chart of Process Flow
Three Waves Guard Rail Roll Forming Machine

3. Main Specification
Item NO 
Description
 
Offered specification
1Roll Forming MachineGuardrail
 
2Material Width760mm
3Rolling Speed5-12m/min
4Rolling Thickness2.0-3.2 mm
5Control SystemPLC  (Panasonic) as list in the note
6Un Coiler10 ton hydraulic de-coiler with coil car
7Pre-cuttingBy hydraulic
8Leveling Station1 station (three rollers over four), 7.5kw
9PunchingFour sets
10Cutting modeHydraulic cutting
11Material Of CuttingCr12Mov quenching 58-62ºC
12Hydraulic Station Power22kw
13Hydraulic Pressure20-25Mpa
14Conveyor table3KW, 6 meters
15Roller Stations20 stations (according the final design)
16Roller MaterialGCR15, HRC58-62ºC
coated with chrome
17Shaft Material and DIA¢100mm, material is 45# forge steel
18Maim Motor Power55kw
19Structure Of The StationsCast iron
20Tolerance3m+-1.5mm
21Electric Source380V, 50HZ,3 phase
According to customer's require
 
22Way Of DriveBy gearbox
23Color Of The MachineYellow and blue
24Container Need1 x40 feet & 1 x20 feet

4. Packing & Delivery
Deliver time: take goods after receive deposit 60 days
Packing: suitable of ocean transportation


5. Warranty
Warranty: 1 year warranty from date of shipment
Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.

 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment

ATTENTION: The profile of the panel is according to the clients!
Send your message to this supplier
Avatar
Miss Nancy Li
Sales Manager
*From:
To: Miss Nancy Li
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now