Gold Member Since 2009
Audited Supplier
Zhangjiagang City Saibo Science & Technology Co., Ltd.

Roll Forming Machine, Tile Roll Forming Machine, Steel Tile manufacturer / supplier in China, offering Tile Build Material Roll Forming Machine, Guide Rail Roll Forming Machine (YX41-41), Double Rows Guide Rail Roll Forming Machine and so on.

(/ )

Supplier Homepage Product Steel tile roll forming machine Tile Build Material Roll Forming Machine

Tile Build Material Roll Forming Machine

FOB Price: Get Latest Price
Min. Order: 1 Piece
Port: Zhangjiagang, China
Production Capacity: 300sets/Year
Payment Terms: L/C, T/T
Basic Info
  • Model NO.: YX25-183-1100
  • Certification: SGS, CE, ISO
  • Customized: Customized
  • Transmission Method: Electric
  • Transport Package: Sea Packing
  • Origin: Jiangsu, China
  • Tile Type: Colored Steel
  • Condition: New
  • Usage: Roof
  • Trademark: SAIBO
  • Specification: CE SGS
  • HS Code: 84552210
Product Description
1. Profile drawing:
Tile Build Material Roll Forming Machine
NoSpecification of the material
1
 
Suitable MaterialColored Steel plate, Galvanized steel
2
 
Width of the raw material1250mm
3Thickness0.4mm-0.6mm

2. Machine Detailed Parameters:
1Machine structureGuide pillar structure
2Total powerMotor power-5.5kw
Hydraulic power-5.5kw
3Roller stationsAbout 11 stations
4Productivity2-4m/min
5Drive systemBy chain
6Diameter of shaft¢70mm solid shaft
7
 
Voltage380V 50Hz 3phases (Customized)
8
 
Container need40GP container
 3. The Chart of Process Flow
Tile Build Material Roll Forming Machine
4. Packing & Delivery
  1. Deliver time: take goods after receive deposit 60 days
  2. Packing: suitable of ocean transportation
5. Warranty
  1. Warranty: 1 year warranty from date of shipment
  2. Guarantee:
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances
-  Damage occurs due to a natural disaster
-  Malfunction occurs due to user error
-  Malfunction occurs due to modifications
-  Malfunction occurs due to further movement or shipment after installation
3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser's account if manufacturer's engineer has to be send to purchaser's factory to maintain the machine during the guarantee period.
 
6. Payment Term
   30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment
 


 
Send your message to this supplier
Avatar
Mr. nancy
*From:
To: Mr. nancy
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now